Affordable Stormwater Design
The Problem Our client needed a SWMP for an interstate electrical transmission line that would be federally permitted. Because of the remote location of the line and dispersed nature of the disturbances the cost of BMPs was potentially unsupportable within their bid costs. Making good decisions in the design phase would be needed to hit...
Read MoreTransmission Line Improvements
The Challenge A sixty mile line from near Carbondale, CO to Hagerman Pass near Leadville. The majority of the line was accessed from forest service roads or utility company right of ways. It took two days to travel the sixty miles for each inspection and the reports were documented with over 100 photos each week....
Read More