Affordable Stormwater Design

The Problem

Our client needed a SWMP for an interstate electrical transmission line that would be federally permitted. Because of the remote location of the line and dispersed nature of the disturbances the cost of BMPs was potentially unsupportable within their bid costs. Making good decisions in the design phase would be needed to hit the target objectives.

The Solution

Summit recognized the unique circumstances that characterized the site.

  • Disturbances at the towers were small because rubber tracked equipment was used.
  • Disturbances were spaced approximately a thousand feet apart from each other.
  • Surrounding land was typically farmland or grassland.
  • Disturbed areas were scheduled for stabilization very quickly after the work was completed

These factors led Summit to develop a set of BMPs that were re-usable, portable, and easily installed by the contractor’s own crews. In this case the affordable SWMP also allowed for a very cost effective approach to Best Management Practices, saving the client thousands of dollars over a conventional approach to BMPs.

Need More Information?

Have a question you’d like to see answered in our library? Would you like a proposal for an upcoming project? Take a quick moment to let us know by filling out the form on our contact page.

Recent Solutions

Noise Monitoring

Noise Monitoring

The Problem This gas development company wanted to begin a new drill operation on a current lease, but the conditions of their permit required a sound monitoring test to verify sound levels during various stages of their operation. The purpose of the test was to...

SWMP in 3 Days!

SWMP in 3 Days!

The Problem Summit received a call from a developer who needed a quick turnaround on a Stormwater Management Plan to meet the requirements of a local city in the Greater Denver metro area.  Having just been informed by the city that he had one week to put a SWMP...

SWMP Checklist Download

SWMP Checklist Download

State of Colorado SWMP (Stormwater Management Plan) review checklist. The link below is for the SWMP checklist used by a state inspector when visiting a construction site to perform a stormwater inspection. The overall purpose of these state visits is to confirm...

The Compliance Curve

The Compliance Curve

Coming Soon - Please Check Back This short video explains two distinct ways to manage compliance. One way forces a choice about how much compliance to achieve by deciding how much you spend. The second way shows how to move the compliance curve so that you can achieve...

SWMP Checklist Download

Surviving a State Inspection

Download our comprehensive guide to surviving a State stormwater inspection. If you have a permitted project in Colorado you need to be aware that the state has increased their inspection staff from two to eight. They have also stated a target of visiting 10% of...

Tag Cloud