A GESC is not enough

The Problem

Summit had a client that relied on their civil engineer to provide their initial stormwater documents. In this case the civil prepared a solid GESC (Grading, Erosion, and Sediment Control) plan that satisfied the city, but they did not prepare a SWMP to meet the requirements of their Colorado Stormwater Discharge Permit. This client had an earlier state inspection prior to our involvement and responded to the state report on their own. The response the client submitted to the State of Colorado was deemed inadequate, and Summit was called in to assist with the follow up response.

The Solution

Summit was able to clarify that although a GESC was in place, the state still required a SWMP. Summit also assisted with a letter responding to the state which demonstrated the steps the client and project had taken to come into full compliance. The result was a site that met both state and local requirements and further enforcement action was averted. Naturally we don’t share client names in examples like this, but we still want to point out that this was not a terrible client, this was not a developer or builder run amok. Instead, this was someone who relied on bad information from another consultant and got sideways with the State. The good news is that this client now has a better understanding of stormwater compliance and has project documentation that will guide them through the rest of the project.

Need More Information?

Have a question you’d like to see answered in our library? Would you like a proposal for an upcoming project? Take a quick moment to let us know by filling out the form on our contact page.

Recent Solutions

Noise Monitoring

Noise Monitoring

The Problem This gas development company wanted to begin a new drill operation on a current lease, but the conditions of their permit required a sound monitoring test to verify sound levels during various stages of their operation. The purpose of the test was to...

SWMP in 3 Days!

SWMP in 3 Days!

The Problem Summit received a call from a developer who needed a quick turnaround on a Stormwater Management Plan to meet the requirements of a local city in the Greater Denver metro area.  Having just been informed by the city that he had one week to put a SWMP...

SWMP Checklist Download

SWMP Checklist Download

State of Colorado SWMP (Stormwater Management Plan) review checklist. The link below is for the SWMP checklist used by a state inspector when visiting a construction site to perform a stormwater inspection. The overall purpose of these state visits is to confirm...

The Compliance Curve

The Compliance Curve

Coming Soon - Please Check Back This short video explains two distinct ways to manage compliance. One way forces a choice about how much compliance to achieve by deciding how much you spend. The second way shows how to move the compliance curve so that you can achieve...

SWMP Checklist Download

Surviving a State Inspection

Download our comprehensive guide to surviving a State stormwater inspection. If you have a permitted project in Colorado you need to be aware that the state has increased their inspection staff from two to eight. They have also stated a target of visiting 10% of...