Speedy SWMP approval in Aurora

The Problem

Some projects are complex because of topography, because of their sheer size, or because they reside in multiple jurisdictions. The project described here was complex primarily because it was located in the City of Aurora. Our client was a residential builder who had extensive experience with multiple cities and counties around the Denver metro area, but had not built in Aurora, so they were unaware that stormwater plans can take six to eight weeks to approve in Aurora.



The Solution

Summit had already worked extensively with the City of Aurora and was able to flow through their process as quickly as possible. The Aurora process requires a PE stamp, city comments and revisions, and final submittal on full sized mylar sheets. BMP details and several other elements must fully comply with the city’s own stormwater guidelines. Because Summit has built a template for Aurora plans and had been through the process successfully many times in the past, we were able to gain approval as quickly as possible. Because we developed both the Aurora plan and the State of Colorado SWMP we were able to keep costs minimal for the builder.


Need More Information?

Have a question you’d like to see answered in our library? Would you like a proposal for an upcoming project? Take a quick moment to let us know by filling out the form on our contact page.

Recent Solutions

Noise Monitoring

Noise Monitoring

The Problem This gas development company wanted to begin a new drill operation on a current lease, but the conditions of their permit required a sound monitoring test to verify sound levels during various stages of their operation. The purpose of the test was to...

SWMP in 3 Days!

SWMP in 3 Days!

The Problem Summit received a call from a developer who needed a quick turnaround on a Stormwater Management Plan to meet the requirements of a local city in the Greater Denver metro area.  Having just been informed by the city that he had one week to put a SWMP...

SWMP Checklist Download

SWMP Checklist Download

State of Colorado SWMP (Stormwater Management Plan) review checklist. The link below is for the SWMP checklist used by a state inspector when visiting a construction site to perform a stormwater inspection. The overall purpose of these state visits is to confirm...

The Compliance Curve

The Compliance Curve

Coming Soon - Please Check Back This short video explains two distinct ways to manage compliance. One way forces a choice about how much compliance to achieve by deciding how much you spend. The second way shows how to move the compliance curve so that you can achieve...

SWMP Checklist Download

Surviving a State Inspection

Download our comprehensive guide to surviving a State stormwater inspection. If you have a permitted project in Colorado you need to be aware that the state has increased their inspection staff from two to eight. They have also stated a target of visiting 10% of...

Tag Cloud