Surviving a State Inspection

Download our comprehensive guide to surviving a State stormwater inspection. If you have a permitted project in Colorado you need to be aware that the state has increased their inspection staff from two to eight. They have also stated a target of visiting 10% of permitted sites each year. You have a 1 in 10 chance of being inspected. Use our guide to prepare and de-stress the State inspection process.

Download PDF

Need More Information?

Have a question you’d like to see answered in our library? Would you like a proposal for an upcoming project? Take a quick moment to let us know by filling out the form on our contact page.

Recent Solutions

Noise Monitoring

Noise Monitoring

The Problem This gas development company wanted to begin a new drill operation on a current lease, but the conditions of their permit required a sound monitoring test to verify sound levels during various stages of their operation. The purpose of the test was to...

SWMP in 3 Days!

SWMP in 3 Days!

The Problem Summit received a call from a developer who needed a quick turnaround on a Stormwater Management Plan to meet the requirements of a local city in the Greater Denver metro area.  Having just been informed by the city that he had one week to put a SWMP...

SWMP Checklist Download

SWMP Checklist Download

State of Colorado SWMP (Stormwater Management Plan) review checklist. The link below is for the SWMP checklist used by a state inspector when visiting a construction site to perform a stormwater inspection. The overall purpose of these state visits is to confirm...

The Compliance Curve

The Compliance Curve

Coming Soon - Please Check Back This short video explains two distinct ways to manage compliance. One way forces a choice about how much compliance to achieve by deciding how much you spend. The second way shows how to move the compliance curve so that you can achieve...

SWMP in 3 Days!

Rapid SWMP saves the day.

The Problem Our General Contractor client had been awarded a project with a start date looming, but learned after being awarded the project that a SWMP was not in place. Without the right stormwater documentation in place, this project was not allowed to break ground....