Download our comprehensive guide to surviving a State stormwater inspection. If you have a permitted project in Colorado you need to be aware that the state has increased their inspection staff from two to eight. They have also stated a target of visiting 10% of permitted sites each year. You have a 1 in 10 chance of being inspected. Use our guide to prepare and de-stress the State inspection process.
Noise Monitoring
The Problem This gas development company wanted to begin a new drill operation on a current lease, but the conditions of their permit required a sound monitoring test to verify sound levels during various stages of their operation. The purpose of the test was to...



