Rapid SWMP saves the day.

Rapid SWMP saves the day.

The Problem Our General Contractor client had been awarded a project with a start date looming, but learned after being awarded the project that a SWMP was not in place. Without the right stormwater documentation in place, this project was not allowed to break ground....
A GESC is not enough

A GESC is not enough

The Problem Summit had a client that relied on their civil engineer to provide their initial stormwater documents. In this case the civil prepared a solid GESC (Grading, Erosion, and Sediment Control) plan that satisfied the city, but they did not prepare a SWMP to...