The Problem Summit received a call from a developer who needed a quick turnaround on a Stormwater Management Plan to meet the requirements of a local city in the Greater Denver metro area. Having just been informed by the city that he had one week to put a SWMP...
The Problem Our General Contractor client had been awarded a project with a start date looming, but learned after being awarded the project that a SWMP was not in place. Without the right stormwater documentation in place, this project was not allowed to break ground....
The Problem Some projects are complex because of topography, because of their sheer size, or because they reside in multiple jurisdictions. The project described here was complex primarily because it was located in the City of Aurora. Our client was a residential...
The Problem Our client needed a SWMP for an interstate electrical transmission line that would be federally permitted. Because of the remote location of the line and dispersed nature of the disturbances the cost of BMPs was potentially unsupportable within their bid...