by Joel | Jun 11, 2026 | Uncategorized
The ultimate goal of stormwater compliance is to ensure that runoff leaving a construction site does not carry sediment, pollutants, or other contaminants into nearby waterways. To achieve this, there are several measures in place to regulate stormwater runoff. Some...
by Joel | Jun 2, 2026 | Uncategorized
In previous blogs, we’ve discussed the differences between structural and non-structural Best Management Practices (BMPs). Another important distinction in stormwater compliance is temporary versus permanent BMPs. While both help manage stormwater runoff and protect...
by Joel | May 26, 2026 | Uncategorized
Wattles are one of the most common stormwater Best Management Practices (BMPs) used on construction sites. However, not all wattles function the same way. While traditional straw wattles have long been used for erosion and sediment control, many projects are utilizing...
by Joel | May 20, 2026 | Blog, Education
Stormwater control measures (CMs), also referred to as Best Management Practices (BMPs), play a critical role in preventing sediment, debris, and pollutants from leaving a construction site. However, simply installing a control measure does not automatically mean it...
by Joel | May 12, 2026 | Company News
At Summit, we provide drone mapping and environmental services to support construction, land development, oil and gas, and infrastructure projects across Colorado (and beyond). From the Front Range to the Western Slope, our team works where our clients need us. We...