Stormwater Design, SPCC, Sampling & Inspection Services

Tag

Rapid Response

Residential Stormwater Management

SWMP in 3 Days!

The Problem Summit received a call from a developer who needed a quick turnaround on a Stormwater Management Plan to meet the requirements of a local city in the Greater Denver metro area.  Having just been informed by the city that he had one week to put a SWMP in place the developer first called...
Read More

A GESC is not enough

The Problem Summit had a client that relied on their civil engineer to provide their initial stormwater documents. In this case the civil prepared a solid GESC (Grading, Erosion, and Sediment Control) plan that satisfied the city, but they did not prepare a SWMP to meet the requirements of their Colorado Stormwater Discharge Permit. This...
Read More
Residential Stormwater Management

Rapid SWMP saves the day.

The Problem Our General Contractor client had been awarded a project with a start date looming, but learned after being awarded the project that a SWMP was not in place. Without the right stormwater documentation in place, this project was not allowed to break ground. Surprises like this can cause aggravating delays at the start...
Read More
Residential Stormwater Management

Speedy SWMP approval in Aurora

The Problem Some projects are complex because of topography, because of their sheer size, or because they reside in multiple jurisdictions. The project described here was complex primarily because it was located in the City of Aurora. Our client was a residential builder who had extensive experience with multiple cities and counties around the Denver...
Read More